Skip to main content
Ramakrishna Electrical Winding Works Logo
RK
Ramakrishna Electrical Winding WorksRamakrishna ElectricalWinding WorksServing since 1950
Who We Are
Services
Products
How We Deliver
Markets
View GalleryGalleryGet Quote

Footer

Ramakrishna Electrical Winding Works Logo
RK
Ramakrishna Electrical Winding WorksServing since 1950
ISO certification
Certification
Certification
Opp Boat Club, Pitapuram Road
Kakinada, Andhra Pradesh - 533003
info@rkelc.com+91 88423 74185

Company

  • About Us
  • Our Team
  • Heritage
  • Careers
  • Contact

Services

  • Repair & Rewind
  • Testing & Inspection
  • Engineering

Markets

  • Power & Renewables
  • Oil & Gas
  • Metals & Mining
  • Marine & Defence

Resources

  • Case Studies
  • Blog
  • FAQ
  • Gallery
  • Quality Assurance

© 2026 Ramakrishna Electrical Winding Works. All rights reserved.

Privacy PolicyTerms of Service

Quality Assurance Plan for HV Stator Coils / Bars / Machines

Ramakrishna Electrical Winding Works — Routine Test Schedule

Quality Assurance Plan
HV Stator Coils / Bars / Machines

Routine test schedule covering every stage from coil manufacturing through stator & rotor assembly to full machine testing. Each test specifies the method, acceptance criteria, sampling frequency and applicable IEC / IEEE / ISO reference standard.

Back to Quality Assurance
QAP Document — Routine Test

Quality Assurance Plan for HV Stator Coils / Bars / Machines

Applicable standards: IEC 60034, IEC 60034-1, IEC 60034-2, IEC 60034-9, IEC 60035, IEEE 43, ISO 1940

Coil Manufacturing
Stator & Rotor Assembly
Full Machine Testing
Sr.NoStageTest / InspectionStage of TestTest MethodAcceptance CriteriaFrequency / SamplingReference
1Coil ManufacturingVisual & Dimensional CheckDuring manufactureMeasurement / VisualAs per drawing / no visible defectEach coilIEC 60034 (visual stage)
2Coil ManufacturingResistance MeasurementDuring manufacture4-wire OhmmeterWithin ±2% of design valueEach coil (5% sample verification)IEC 60034
3Coil ManufacturingInsulation Resistance (IR)After VPI / impregnationMegger (500V or 1000V)≥100 MΩ @ 40°CEach coilIEC 60034-1, IEEE 43
4Coil ManufacturingAC High Voltage TestAfter slot placing / after wedging / completed windingDielectric withstand (2U + 1 kV, 1 min)No breakdown or partial discharge >5 pCEach coilIEC 60034
5Coil ManufacturingSurge Comparison TestPre- and Post-impregnation / after slot placingSurge tester (waveform comparison)Waveforms identical, no shorted turnsEach coilIEC 60035
6Coil ManufacturingTan δ / CapacitanceAfter impregnationCapacitance bridge (0.2U–1.0U stepwise)Smooth increasing trend, no sudden deviationEach coilIEC 60034
7Stator & Rotor AssemblyDimensional Check (Air Gap, Core Fit)Assembly stageFeeler gauge / Dial gaugeAs per drawing ± toleranceEach machineIEC 60034 mechanical checks
8Stator & Rotor AssemblyWinding ResistancePost-assemblyBridge methodPhase unbalance ≤1%Each machineIEC 60034
9Full Machine TestingIR & PI (Polarization Index)Before run testMegger (1kV/5kV)IR ≥100 MΩ, PI ≥2Each machineIEEE 43
10Full Machine TestingHV TestAfter winding connection2U + 1 kV, 1 minNo flashover/breakdownEach machineIEC 60034
11Full Machine TestingNo-load & Load TestFinal testPerformance test benchEfficiency & PF ≥ nameplateEach coilIEC 60034-2
12*Full Machine TestingVibration TestFinal testVibration meter (RMS)≤2.8 mm/s (ISO 1940)Each machineISO 1940
13*Full Machine TestingNoise TestFinal testSound level meter≤85 dB(A)Each machineIEC 60034-9

Note: * These tests are conducted based on the availability of complete machine.

Need a project-specific QAP?

We tailor our Quality Assurance Plans to your equipment type, OEM specs and regulatory requirements.

Request Custom QAP
  1. Home
  2. How We Deliver
  3. Quality Assurance
  4. Detailed QAP